I need some advice.
I have a project in a small City that has the following situation:
There are 3 Parcels from a record Parcel Map and 1 parcel from a dedication. The dedication is shown on the original PM as an easement so no mandatory Record of Survey, I think. I concluded that by the letter of the law even though the easement shown on the Parcel Map is not deeded property, as of that date, I don't need to file a Record of Survey since the line is shown on a map of record.......
Any hoot, the Architect has devised a new ground up plan that has the building straddling the original line between Parcels 1 & 2 and including the dedication parcel.
He wants the original Parcel 3 shrunk to fit a new parcel to be sold for separate development.
Planning conditioned that the line between 1 & 2 be merged into 1 and the original line 3 be adjusted. They missed the fact the there is a 4th dedication parcel line being crossed also.
I am trying to do all of this without a Parcel Map due to fees and project deadlines, etc.
Does anyone have any insight on this?
I'm thinking it may be okay to process some sort of merger/LLA all concurrently without triggering a PM. Unfortunately, the City is not fluent in SMA, so it is up to me to make this a legal adjustment.
Any ideas/input?
Lot Line Adjustment/Parcel Merger
-
rpost
- Posts: 169
- Joined: Wed Aug 18, 2010 1:40 pm
- Location: San Diego, CA
Lot Line Adjustment/Parcel Merger
Ryan Post, LS
ATC Design Group
Escondido, CA
ATC Design Group
Escondido, CA
- Ian Wilson
- Posts: 1087
- Joined: Sat Aug 03, 2002 6:58 am
- Location: Bay Area
Whoa! Dedication? To whom & for what purpose?
Dedication means the parcel is being held in trust for the Public. It also means no Lot Line Adjustment. The dedication must be vacated & given back before anything can move forward.
Sounds like the Architect is pushine 10# of stuff in a 5# bag.
If you'd like, call me after 3PM today to discuss. (I have a quick trip to the field & a meeting until then.)
.
Dedication means the parcel is being held in trust for the Public. It also means no Lot Line Adjustment. The dedication must be vacated & given back before anything can move forward.
Sounds like the Architect is pushine 10# of stuff in a 5# bag.
If you'd like, call me after 3PM today to discuss. (I have a quick trip to the field & a meeting until then.)
.
Ian Wilson, P.L.S. (CA / NV / CO)
Alameda County Surveyor
Alameda County Surveyor
-
rpost
- Posts: 169
- Joined: Wed Aug 18, 2010 1:40 pm
- Location: San Diego, CA
Follow Up
I talked with Ian about this and now have a direction in which to advise my client.
Kudos to this great professional environment that we can all use to obtain knowledge in our profession.
Kudos to this great professional environment that we can all use to obtain knowledge in our profession.
Ryan Post, LS
ATC Design Group
Escondido, CA
ATC Design Group
Escondido, CA
-
bruce hall
- Posts: 645
- Joined: Sun Oct 05, 2003 9:18 pm
- Location: huntington beach, orange county, california