Sundays Comics and c/l ties gone bad
Posted: Sun Aug 19, 2012 10:49 am
The job is an ALTA. I did some online research and found a PM that recorded in 2010 and actually did a breakdown of the lot I am working on. The north line of the PM is *supposed* to be the south line of my lot. I also was able to get the current ties for the surrounding streets.
Looked nice, but it seems Murphy always shows up on a job and applies his own law to fit the situation. This time, the situation was the boundary.
Starting with the ties to the north, which is Pt No 3 on the PDF.
When the contract surveyor who did the pre construction tie out and the subsequent post construction monumentation submitted the final ties, a standard note was placed on each one of his ties. It reads...
"No claim is made as to the relationship of the points or lines shown hereon to true boundary, centerline tie or centerline locations"
Ok, I agree to that. So the filing surveyor is saying, without a shred of doubt, Use at your own risk. This tied out point needs to be verified by surveyors doing retracement.
The tied out point may only be the intersection coming in from the north. The intersection coming up from the south where I am working, may intersect offset to where the tied point is. The point is, you cannot trust ties that have that disclaimer on it.
The PM however just did a blind acceptance and because the recording surveyor did that, he notes Pt 6 on his PM and calls an original tract corner 0.12' away from what is now a True Corner. Surveyors are setting too many True Corners.
Well..long to short is that I have found some serious flaws in the 2010 PM. It looked good on paper, but in the field it just did not wash. I haven't shown every flaw on the PDF. The monument set at the SE corner of my lot is an inch off. This is proven by the two original monuments we found that are north and south of his monument. Using the two originals and prorating in a new position (0.02' different from record) the PM monument, No. 11 in the PDF, is 0.09' south.
To some an inch may not mean much, but this is a special situation.
My line is between Pts. 11 and 14.
Something happened when the building on the south was constructed. The building was placed 6 inches over line. In 1997 an easement was granted for this situation that occupies the southerly 6 inches of my parcel. Using the 2010 PM monument would, may, cause a clear building line to be over by an inch.
I don't know, we have one more day to run the last of the job, but I definitely need all the room I can get on that south line and having two original monuments displace a 2010 PM monument is pretty nice. Unless I find contrary senior evidence, I usually accept a monument in place. From the appearance of everything, no one has used that 2010 monument for anything.
Anyway...take a look at the PDF..I also thought the note of the least squares establishment of my north line was 'cute'. Never seen that before and I hope I never do.
I really hate it when I come across sloppy work, but fibbing on a record map is just the worst!
PS The abbreviation on the PDF "SFNF" stands for 'searched for, nothing found'. I have found three different places where that statement is 100% untrue.
Looked nice, but it seems Murphy always shows up on a job and applies his own law to fit the situation. This time, the situation was the boundary.
Starting with the ties to the north, which is Pt No 3 on the PDF.
When the contract surveyor who did the pre construction tie out and the subsequent post construction monumentation submitted the final ties, a standard note was placed on each one of his ties. It reads...
"No claim is made as to the relationship of the points or lines shown hereon to true boundary, centerline tie or centerline locations"
Ok, I agree to that. So the filing surveyor is saying, without a shred of doubt, Use at your own risk. This tied out point needs to be verified by surveyors doing retracement.
The tied out point may only be the intersection coming in from the north. The intersection coming up from the south where I am working, may intersect offset to where the tied point is. The point is, you cannot trust ties that have that disclaimer on it.
The PM however just did a blind acceptance and because the recording surveyor did that, he notes Pt 6 on his PM and calls an original tract corner 0.12' away from what is now a True Corner. Surveyors are setting too many True Corners.
Well..long to short is that I have found some serious flaws in the 2010 PM. It looked good on paper, but in the field it just did not wash. I haven't shown every flaw on the PDF. The monument set at the SE corner of my lot is an inch off. This is proven by the two original monuments we found that are north and south of his monument. Using the two originals and prorating in a new position (0.02' different from record) the PM monument, No. 11 in the PDF, is 0.09' south.
To some an inch may not mean much, but this is a special situation.
My line is between Pts. 11 and 14.
Something happened when the building on the south was constructed. The building was placed 6 inches over line. In 1997 an easement was granted for this situation that occupies the southerly 6 inches of my parcel. Using the 2010 PM monument would, may, cause a clear building line to be over by an inch.
I don't know, we have one more day to run the last of the job, but I definitely need all the room I can get on that south line and having two original monuments displace a 2010 PM monument is pretty nice. Unless I find contrary senior evidence, I usually accept a monument in place. From the appearance of everything, no one has used that 2010 monument for anything.
Anyway...take a look at the PDF..I also thought the note of the least squares establishment of my north line was 'cute'. Never seen that before and I hope I never do.
I really hate it when I come across sloppy work, but fibbing on a record map is just the worst!
PS The abbreviation on the PDF "SFNF" stands for 'searched for, nothing found'. I have found three different places where that statement is 100% untrue.