Chain!
- Dave Karoly, PLS
- Posts: 670
- Joined: Fri Aug 30, 2002 6:26 pm
- Location: Sacramento
-
LS 4722
- Posts: 479
- Joined: Wed Aug 15, 2007 8:42 am
Dewards pincushion comment no. 2
Let get one thing clear Deward. A 'pin cushion' is setting an additional monument near one that was already there, this is clearly not the case.dewardkb wrote:There are multiple examples of you ignoring the monuments on the ground, why try and deny it? Anyone can see multiple virtual pin cushions who looks at the drawing. You seem to be saying you ignored it because it is disturbed yet this information does not appear on the drawing.
Let's take another one then.....FD. RUSTY SPIKE AND TIN 0.2' DOWN - NO REF - S 57 deg E. 0.18' FROM LOT LINE AND R/W LINE INTSECTION
How can you deny the fact this drawing has "pin cushions"?
The spike I call off is being controlled by two different monumented lines. The centerline of Melwood Drive and the found monuments that define the line of Tract No. 10001. One of the tract monuments is an original 2" IP, the other one is a 4" x 4" redwood post in a 6" iron casing, most likely set by the
subdividing engineer, Edward Lynch, who surveyed most of that area in the 20's and 30's.
Next time you start throwing rocks just be careful you don't break your own window.
Two attachments
PS I know I said I was quitting this thread, but I changed my mind cause Dewards grasping at straws to find fault has been bugging me.
You do not have the required permissions to view the files attached to this post.
-
Keithwill
- Posts: 197
- Joined: Mon Mar 26, 2007 4:24 pm
- Location: Portland, OR
Olin,
You posted...Except, there is a pipe at your front right corner that does not fit this pattern. It is perfect for street alignment but short .15' for stationing to the nearest point to the north, and long .15 to the nearest point to the south.
Are you actually worried about that kind of measurement?
You posted...Except, there is a pipe at your front right corner that does not fit this pattern. It is perfect for street alignment but short .15' for stationing to the nearest point to the north, and long .15 to the nearest point to the south.
Are you actually worried about that kind of measurement?
-
Johnston
- Posts: 43
- Joined: Mon Oct 08, 2012 9:46 am
Keith: YES
It's my understanding that you are retired from BLM, and I assume are used to dealing with large rural properties. Given that, I can understand that you seem incredulous about 0.15'. However I think you need to come out of the BLM woods and realize that there are many instances where 0.15' would be considered excessive by surveyors, such as those working in any area where the the building setbacks are zero, the land and improvement values are sky high, and the 150 year old control points are only a half block away in each direction. You cannot ignore the context as you seem so willing to do.
I'm not saying what you should do with the 0.15' (there are likely more factors than I described) but given the context you've got to look hard at it, like Olin is obviously doing.
I'm not saying what you should do with the 0.15' (there are likely more factors than I described) but given the context you've got to look hard at it, like Olin is obviously doing.
-
Keithwill
- Posts: 197
- Joined: Mon Mar 26, 2007 4:24 pm
- Location: Portland, OR
It is true that I am retired from BLM and we did not have many resurveys where your kind of measurements were bandied about.
But.....and it is a huge but......Is it not even more important to recognize and accept existing monumentation rather then ignore acceptable monuments and set new ones at your precise measured distance?
There is a reason why those monuments are the and have been accepted by the landowners.
Imagine the look on the faces of the land owners when they pay for a high priced (in their minds) survey and they then see two or more monuments that the surveyors cannot agree on!
I have yet to see an answer to my repeated questions about present day surveyors accepting my numerous 1/16 sec. cor. monuments that I know are no where close to your present day precise measurements.
Answer that legal question and then we will talk about measurements the length of my middle finger.
But.....and it is a huge but......Is it not even more important to recognize and accept existing monumentation rather then ignore acceptable monuments and set new ones at your precise measured distance?
There is a reason why those monuments are the and have been accepted by the landowners.
Imagine the look on the faces of the land owners when they pay for a high priced (in their minds) survey and they then see two or more monuments that the surveyors cannot agree on!
I have yet to see an answer to my repeated questions about present day surveyors accepting my numerous 1/16 sec. cor. monuments that I know are no where close to your present day precise measurements.
Answer that legal question and then we will talk about measurements the length of my middle finger.
-
Keithwill
- Posts: 197
- Joined: Mon Mar 26, 2007 4:24 pm
- Location: Portland, OR
-
LS 4722
- Posts: 479
- Joined: Wed Aug 15, 2007 8:42 am
This picture is for you Keith
Amazing huh?
You do not have the required permissions to view the files attached to this post.
-
LS 4722
- Posts: 479
- Joined: Wed Aug 15, 2007 8:42 am
Just what is Olin doing?
..like Olin is obviously doing.
He is
1. Ignoring a previously established and land owner accepted corner in favor of math adventures.
2. Biased in his survey to give the client building a new house the maximum frontage he can.
3. Slandering title of the next door neighbor.
4. Being afraid following surveyors will contradict his acceptance of the pipe not realizing that just about any court in the land would agree with his acceptance of the pipe.
-
Olin Edmundson
- Posts: 229
- Joined: Sun Nov 09, 2014 8:37 am
-
LS 4722
- Posts: 479
- Joined: Wed Aug 15, 2007 8:42 am
Olin
Suppose you pincushion. The client gets his frontage. The home sells. New owner doesn't get along with his neighbor. Has a survey done. His surveyor uses your record and monument and locates the block wall. Wall is reported to be 2 inches over line. He sues his neighbor to get the wall removed and replaced, and yes this has happened a lot."Slander of Title" for calling off a monument that has no other pieces of evidence to corroborate? Please!
Court takes place to hear both sides. A survey is produced that shows your monument and record. Opposing attorney produces a 25 year old survey that the neighbor had done and who built the wall according to the pipe.
Now what do you say when the judge asks you why you did not accept a 25 year old pipe?
-
Olin Edmundson
- Posts: 229
- Joined: Sun Nov 09, 2014 8:37 am
-
LS 4722
- Posts: 479
- Joined: Wed Aug 15, 2007 8:42 am
Olin
Maybe surveyors do, but acceptance by title owners common to the pipe trumps it all... A preponderance of evidence, I think this is what they would look to..
Unfortunate that you come back to being able to measure and cannot see the greater picture...The truth is that surveyors today and 100 years ago could measure
This is probably the blame of those who mentored you.
PS It's not about creating new corner positions, it's about discovering where existing ones are.
Edit: Preponderance of Evidence
A standard of proof that must be met by a plaintiff if he or she is to win a civil action.
Legal term. All plaintiff has to do is mention the pipe.
Sorry :P Just had to throw this in
-
Olin Edmundson
- Posts: 229
- Joined: Sun Nov 09, 2014 8:37 am
-
Olin Edmundson
- Posts: 229
- Joined: Sun Nov 09, 2014 8:37 am
- Dave Karoly, PLS
- Posts: 670
- Joined: Fri Aug 30, 2002 6:26 pm
- Location: Sacramento
-
Olin Edmundson
- Posts: 229
- Joined: Sun Nov 09, 2014 8:37 am