Another ROS/Corner Record dilemma

Post Reply
MikeTurnrose
Posts: 218
Joined: Thu Apr 01, 2010 9:41 am

Another ROS/Corner Record dilemma

Post by MikeTurnrose »

I just finished a boundary survey of a 5 acre parcel in a heavily wooded steep area of the Santa Cruz Mountains. I found several monuments that are shown on recorded survey maps. The measurements I made are quite a bit different from what the prior surveys show, so I'm trying to decide whether an RS is required or not. All the lines I surveyed are shown on recorded maps, so that would eliminate one of the conditions for an RS. On one side of the parcel I measured between two pipes to be 803.88 feet. Two record maps show the dimension to be 806.55. One of the maps was done in 1975. The other was 1981. I feel good about my measurements. I did not close out the traverse, but did turn full sets to all my control points. I've done enough closed traverses with this gun (even in rugged terrain) where I think my measurements are accurate. One small source of possible error in my work would be using swing ties to tie in the pipes (couldn't see due to a tree being on line), but I don't think that would account for much discrepancy. On the other side of the property, I measured between two pipes and found the distance to be 825.67 v. 825.07 record map (no discrepancy here in my opinion) The two northern corners (which were way down a steep hill) measure 292.02 v. 289.34 (map) v. 290.87 (deed). I found another pipe along the west line that I'm not sure of the origin. It measures 195.01 v. 199.33 (record map). This pipe was not tagged and was in the middle of the road. This pipe may be the one that pushes the RS requirement, but I wanted to get others opinions. I'm not looking for criticism of my survey methods here. I'm just trying to make an informed decision on this. Thanks.
Ric7308
Posts: 719
Joined: Thu Nov 17, 2005 2:50 pm

Post by Ric7308 »

File an RS
MikeTurnrose
Posts: 218
Joined: Thu Apr 01, 2010 9:41 am

Ric

Post by MikeTurnrose »

I was leaning that way, but it's not an easy phone call to the client asking them to shell out a $600 map checking fee. Map checking fees are another issue altogether. I have a clause in my contract that allows for the R/S trigger, but I had expected to obtain better measurement results in relation to the record, so this is unexpected.
User avatar
Jim Frame
Posts: 1599
Joined: Thu Oct 17, 2002 8:52 pm
Location: Davis, CA
Contact:

Post by Jim Frame »

The public policy behind the ROS requirement is the maintenance of accurate public land net records. As standard of practice measurement capabilities improve over time, the concept of material discrepancy changes with them. Even in rough terrain, differences between measured and record distances on the order of a foot are hard to characterize as immaterial.

I agree with Ric.

.
Jim Frame
Frame Surveying & Mapping
609 A Street
Davis, CA 95616
framesurveying.com
User avatar
hellsangle
Posts: 710
Joined: Tue Mar 06, 2007 8:31 am
Location: Sonoma, CA
Contact:

swing tie?

Post by hellsangle »

Mike,

If I understand correctly, the point was behind a tree and you employed two swing ties. And assuming you tied the two points that had each had swing tie to the pipe . . . I also assume you did distance/distance calc? If so, there are two answers for a distance/distance calc. You might check to see if you have the correct one (which can be checked graphically in your software. Just in case . . . )?

Best,

Phil - Sonoma
MikeTurnrose
Posts: 218
Joined: Thu Apr 01, 2010 9:41 am

Phil

Post by MikeTurnrose »

Yes, I did a distance-distance intersect and did check the two solutions. I drew a sketch of it and everything. For the southwest corner pipe, I was able to do three swing ties (more or less on all sides of the pipe). That's the ideal way to do this sort of thing. On the northwest one, I was only practically able to do two ties. Slope and tree issues made a third tie ineffective.
User avatar
LS_8750
Posts: 1166
Joined: Tue Jul 20, 2010 5:36 pm
Location: Sonoma
Contact:

Post by LS_8750 »

Those hills are alive Mike. Blame it all on earthquakes. File the RoS, $460.
Clark E. Stoner, PE, PLS
Bear Flag Engineering, Inc.
Sonoma County
Santa Cruz County
tel. 707.996.8449 (Sonoma) or 831.477.9215 (Santa Cruz)
clark@bearflagcivil.com
dmi
Posts: 981
Joined: Wed Dec 08, 2004 7:42 pm
Location: San Francisco
Contact:

clsa agreement between client and consultant

Post by dmi »

I would recommend you have "the talk" with the client from the outset. Almost any survey could result in the need to file a record of survey. Language in the standard CLSA Agreement addresses this issue very well.
Dane Ince, LS
Certified Federal Surveyor
415-321-9300
WWW.SanFranciscoSurveyingCompany.com
JasonCamit
Posts: 103
Joined: Tue Apr 20, 2010 8:21 am
Location: Fresno
Contact:

Standard Agreement

Post by JasonCamit »

Where can I find this standard agreement? I must be blind. Can someone help.
MikeTurnrose
Posts: 218
Joined: Thu Apr 01, 2010 9:41 am

ROS

Post by MikeTurnrose »

Jason, check the CLSA store. They have standard agreements. I use most of their language for my contracts.

Clark (LS 8750)--Check your private messages.
LA Stevens
Posts: 290
Joined: Mon Dec 03, 2007 11:03 am
Location: Marin County, California
Contact:

CLSA Contract

Post by LA Stevens »

If you are a CLSA Member, you can get the standard contract in Word format off of the members section downloads.

Membership pays off any many ways!
Larry

Lawrence A. Stevens, PLS
L.A. Stevens & Associates, Inc.
Professional Land Surveyors
7 Commercial Blvd., Suite One
Novato, CA 94949
P 415-382-7713

http://www.LAStevensInc.com
http://www.LSACTS.com
E_Page
Posts: 2144
Joined: Thu Jun 23, 2005 6:49 am
Location: El Dorado County

Post by E_Page »

The purpose of closing a traverse isn't just to have a closure resulting from any inaccuracies, or more accurately systematic errors in your instrumentation so that you can adjust it out to theoretically come closer to true positions.

One of the most important (the most important IMO) reason to close your traverse is for blunder detection. Even the most careful surveyors make mistakes from time to time. The surveyor who has never made a mistake has never measured anything. I was thinking the same thing that Phil mentioned. The point where you used 3 swing ties should alleviate the concern at that point, but the one with only 2 leaves more room for doubt. If you have any doubt at all, best go double check those or find some other demonstrable method of eliminating one of the 2 points a distance-distance intersection gives.


The RS filing requirement is not at all dependent upon whether or not you had prepared your client for the possibility or whther the client wants to pay the fees associated with preparing and filing the map. If you hit one or more of the triggers, you file the map. IMO, you have material discrepancies along at least 3 lines. If this is rough mountain property with little to no likelihood of high density development, the 0.60' in 825.7' is probably not material.

I see that 2.67' of discrepancy shows up on 2 lines. Are these discrepancies in similar directions? Are these relative to the same map? In each case, your distance is long. It may be a coincidence, or it may be indicative of errors in the previous surveyor's work which are not present in yours, but if one end of each of these lines was measured from on part of your control (same control point or same branch of your unclosed traverse), and the opposite ends of these lines were measured from another part of your control (point or branch of unclosed traverse), I'd have a serious question as to whether the discrepancy was a result of a mistake in the previous survey or a mistake in yours. If it were my survey and I had a pattern of discrepancies that I could not say with certainty (and demonstrate it with a closed traverse or other similarly certain checks) whether the error were mine or not, I'd be planning a return trip to close out the traverse, find a common point to tie visible from each branch of my open traverse, and/or double check measurements in the locations most likely to contain a blunder resulting in the discrepancies found.

Surveying in such terrain, material discrepancies are a high likelihood if not a certainty. A letter at the front end of the job accompanying the contract adequately explaining the possible or probable need to file an RS would have done one of 2 things. It would have prepared the client for the possibility of the cost of an RS, or it would have weeded out a cheapskate client that you are better off not working for.

"But times are tough and I need all the work I can get!"

If the client is so cheap that they will refuse to pay for the added cost of a RS, then you have 2 possible problems. One, you now have to weigh your ethics against your ability to pay the rent and buy groceries. Two, you are probably losing money or breaking even anyway. I'd rather sit at home and go broke slowly than work really hard to go broke faster.
Evan Page, PLS
A Visiting Forum Essayist
Dylan Kolstad
Posts: 20
Joined: Wed Jun 17, 2009 9:30 am

Post by Dylan Kolstad »

I'll presume you know the quality of your survey work & measurements better than us.

If you feel based on the evidence in the field and your research that the survey monuments you found were not disturbed and serve as reasonable evidence of the "corner" locations despite the sloppy work, and if you were marking lines during this survey, you should do the RS to protect yourself and your client.

If you were hired to just find these monuments and feel you've completed the tasks under your agreement with the owners, educate them on the errors you're seeing and advise them that the pins are likely encroaching on the neighbors, and they're at risk of a dispute with neighbors in time if they fence or use every inch of the property. Recommend to them that they hire you to finish this boundary survey with a map and the reasons why same is a good idea. If they say no, well, maybe you'll be back later when said dispute arises, and your fees will suddenly be higher...

If you feel the monuments are not reliable for more reasons than just the poor measurements, to serve your client, you may need to do more field work and bugger the costs...
User avatar
Jim Frame
Posts: 1599
Joined: Thu Oct 17, 2002 8:52 pm
Location: Davis, CA
Contact:

Post by Jim Frame »

If you were hired to just find these monuments and feel you've completed the tasks under your agreement with the owners, educate them on the errors you're seeing and advise them that the pins are likely encroaching on the neighbors
Advising your client that the monuments are not in the locations indicated by the deeds or maps constitutes disclosure of material discrepancy. As soon as you do that, you're on the hook for a ROS.

.
Jim Frame
Frame Surveying & Mapping
609 A Street
Davis, CA 95616
framesurveying.com
dmi
Posts: 981
Joined: Wed Dec 08, 2004 7:42 pm
Location: San Francisco
Contact:

What do feeling have to do with professional opinion?

Post by dmi »

I must have slept through that lecture.

Rules of the Board for Professional Engineers and Land Surveyors
California Code of Regulations Title 16, Division 5 §§ 400-476

476. Code of Professional Conduct – Professional Land Surveying
(c) Representations:
(7) A licensee shall only express professional opinions that have a basis in fact or experience or accepted land surveying principles.
Dane Ince, LS
Certified Federal Surveyor
415-321-9300
WWW.SanFranciscoSurveyingCompany.com
7702
Posts: 392
Joined: Mon Jan 10, 2005 6:57 pm

The benefit of the doubt...

Post by 7702 »

Comments referring to the earlier work as being "sloppy" and "poor" because it doesn't agree within a couple feet of a stubbed out traverse performed 30 odd years later on steep, possibly unstable ground is a bit unfair to the original surveyors. They may have set those monuments with the utmost care. Monuments have a way of moving over the years, especially on steep, coastal property in California. And it's not all that uncommon for landowners to disturb them, either accidentally, or on purpose.
Mark Moore, LS 7702
MikeTurnrose
Posts: 218
Joined: Thu Apr 01, 2010 9:41 am

Thanks all for the comments.

Post by MikeTurnrose »

I think I will heed the advice of Evan and others and go back out (yes, a third time) and close out the traverse before doing the RS. It will probably take me a couple of hours. I ran an open traverse with tribrachs and turned full sets all the way through, but still there is that very small possibility that there may be an EDM/instrument error and/or not having the tripod set over the point. I have had that happen once before, but I found the error in the field, when I looked through the optical plummet and saw that the tribrach wasn't over the point. Better be safe than sorry.

The original surveyor on this job was an RE who set the pipes in the early to mid 70's. I've retraced his work before and have found discrepancies, so I wouldn't be surprised in this case, if the discrepancies are valid.
7702
Posts: 392
Joined: Mon Jan 10, 2005 6:57 pm

Post by 7702 »

Mike,

I would be willing to wager that there is nothing wrong with your carefully performed measurements. However, until you close your traverse, there will always be that lingering cloud of uncertainty.

On another note, a closed traverse does not always indicate accurate measurements contained therein. For example, a proportional error in the distance measurement, say from grossly incorrect entries of EDM ppm corrections, will not be detectable in a closed loop.
Mark Moore, LS 7702
User avatar
LS_8750
Posts: 1166
Joined: Tue Jul 20, 2010 5:36 pm
Location: Sonoma
Contact:

Post by LS_8750 »

Well that's one of the beauties of having obsessive compulsive disorder.... Often having quadruple checked yourself on every control point five or six times, sometimes you can just say hey... My measurements are good! The previous guy was out... That's cool until you discover your best party chief is truly dislexic.... That's when a cut 0.96 becomes a fill 0.69.... Turns out he was OCD too, so he 92.5% of the time caught his own mistakes...

But again, when you have seen the damage caused to buildings within three miles of your job site caused by the Loma Prieta quake, you can rest yourself much easier when you find a bearing and distance call different from record by a couple, or a few feet. A found monument is just that. But then the next ridge over everything fits within a couple tenths. And then you inverse ridge to ridge and find a couple hundredths. Welcome to the Santa Cruz Mountains Mike.

Good luck with your error theory analysis in a country littered with ancient landslides and so seismically jumpy that the USGS records about 50 earthquakes a day ranging from 2.5-3.5 on the Richter scale within 25 miles of your job site.

I bet your ties are fine. I also bet I would find you out by at least 0.4 feet within a year assuming no substantial quakes happened in the area....

Cheers,
Clark
Clark E. Stoner, PE, PLS
Bear Flag Engineering, Inc.
Sonoma County
Santa Cruz County
tel. 707.996.8449 (Sonoma) or 831.477.9215 (Santa Cruz)
clark@bearflagcivil.com
User avatar
LS_8750
Posts: 1166
Joined: Tue Jul 20, 2010 5:36 pm
Location: Sonoma
Contact:

Post by LS_8750 »

I'm away from my desk Mike, but maybe google "Clark's Geology Map Santa Cruz" and "USGS earthquakes daily California". You will see what I'm talking about..
Clark E. Stoner, PE, PLS
Bear Flag Engineering, Inc.
Sonoma County
Santa Cruz County
tel. 707.996.8449 (Sonoma) or 831.477.9215 (Santa Cruz)
clark@bearflagcivil.com
RAM
Posts: 770
Joined: Thu Mar 31, 2005 8:16 am
Location: Central Cal Mountains

Post by RAM »

back to the orginal question, I have found that if I ask myself if I should file a map, the right answer is always FILE the MAP. If it is gray, FILE THE MAP., Better safe than sorry.
User avatar
land butcher
Posts: 1615
Joined: Fri Jul 26, 2002 7:26 pm
Location: calif

Post by land butcher »

Recently had a EDM shoot a bad distance to a distinctive topo point, off about 20ft. Don't know why, caught it reviewing the plot. Went back out and repeated the shot from same setup and got a correct result.
They do have their quirks. Nothing is perfect and we cover our butts with redundancy.
User avatar
Jim Frame
Posts: 1599
Joined: Thu Oct 17, 2002 8:52 pm
Location: Davis, CA
Contact:

Post by Jim Frame »

They do have their quirks.
My Leica 1100 recently switched -- without my knowledge or consent -- to reflectorless and took 5 consecutive shots to the same spot on a wall. Unfortunately, they were supposed to be face-of-curb shots. I didn't notice until I was back at the office. :(

Okay, Mr. Robot, you've got my attention now. Happy?

.
Jim Frame
Frame Surveying & Mapping
609 A Street
Davis, CA 95616
framesurveying.com
MikeTurnrose
Posts: 218
Joined: Thu Apr 01, 2010 9:41 am

Update

Post by MikeTurnrose »

I went out there yesterday and closed out the traverse. I closed less than .02'. I suppose that 1/68000 is good enough. :) Never hurts to check.
Post Reply